Home / Testing laboratory

Testing laboratory

About the Laboratory

We carry out comprehensive commissioning of electrical installations and equipment

Our laboratory is ready to carry out comprehensive commissioning of your electrical installations and/or equipment and provide a complete set of documents necessary for their successful start-up and reliable operation. We will also be glad to offer you the following services separately:

  • Electrophysical measurements (EPM);
  • High-voltage testing;
  • Testing and commissioning of relay protection devices;
  • Testing of emergency automation and signaling systems with issuance of a report confirming compliance with TNPА requirements
  • Transformer oil regeneration
    More
Laboratory
Laboratory

Reliability

100%

We love what we do, and our main goal is to meet the needs of our clients so that you keep coming back to us. To maintain a leading position in the market, we have equipped our laboratory with the most modern equipment and highly qualified personnel with many years of experience. We are accredited by the State Enterprise “BGCA” for compliance with the GOST ISO/IEC 17025–2019 standard in one of the broadest scopes of accreditation in Belarus (details here).

Types of testing

Here, we HAVE SOMETHING TO AMAZE YOU WITH. Make sure to read until the very end!

Electrophysical measurements, as well as high-voltage testing, have always been and remain the cornerstone of all commissioning works. We will perform any type of these tests for you, as always, flawlessly, on time, and with a guarantee.

However, the development of the energy sector constantly imposes new requirements on both types of testing and the methods used to perform them. Therefore, we do not stand still and have already mastered a number of the newest techniques. For example, we are the first laboratory in Belarus accredited to test cable lines (CL) 6–20 kV at a frequency of 0.1 Hz.

bracket
bracket

The first laboratory in Belarus accredited to test 6–20 kV cable lines (CL) at 0.1 Hz

In contrast to most laboratories in the country, we avoid applying constant overvoltage when testing XLPE-insulated cable lines, preventing irreversible damage to the insulation.

For this purpose, we employ a specialized 0.1 Hz very low frequency (VLF) testing system, as recommended by cable manufacturers and modern commissioning standards. Moreover, our team has extensive experience in installing cable joints and repairing cable lines in case of insulation failures.

bracket
bracket

We use a specialized 0.1 Hz very low frequency (VLF) testing system

service
service
service
service

Cleaning, drying and degassing of oil during commissioning and maintenance of various large transformer equipment

  • transformer oil purification;
  • transformer oil drying;
  • transformer oil degassing.
More

Electrophysical measurements (EPM)

  • measurement of insulation resistance of lines and equipment;
  • measurement of grounding (earthing) device resistance;
  • measurement of lightning protection resistance;
  • verification of grounding (earthing) circuit continuity;
  • testing of phase-to-neutral circuit;
  • testing of RCD (residual current device) trip parameters and leakage currents in the line;
  • testing the operation of circuit breaker trip units (load testing).

High-voltage testing

  • testing of power and instrument transformers 0.4–10 kV;
  • testing of cable lines (CL) 6–20 kV using very low frequency (VLF) 0.1 Hz;
  • testing of cable lines (CL) 6–10 kV with DC voltage;
  • testing of complete switchgear assemblies (KRU);
  • testing of insulators and switching devices;
  • testing of protective devices (fuses, surge arresters, lightning arresters);
  • testing of electric motors, reactors and capacitors.

Commissioning of electrical equipment

  • transformer substations and reactive power compensation installations;
  • switchgear 0.4–10 kV;
  • any switching devices 0.4–10 kV;
  • relay protection, emergency automation and signaling devices;
  • transformer parameters:
    • - DC winding resistance;
    • - transformation ratio;
    • - no-load losses and currents;
    • - magnetization curve (V–I characteristic).

Certificates

Certificate

Accreditation certificate

BY/112 2.5218 dated 14.08.2020

The Testing Laboratory of PromstroyElectro LLC complies with the requirements of GOST ISO/IEC 17025-2019 and is accredited in the scope of accreditation attached to this certificate.

Certificate

SCOPE OF ACCREDITATION

Covers testing of power and measuring transformers, electric motors, surge arresters and lightning arresters, fuses, all types of switching devices, insulators, cable lines, capacitors, overhead power lines, circuit breakers, RCDs, grounding devices, and relay equipment.

Certificate

CERTIFICATE

Participant in the interlaboratory proficiency testing

The testing laboratory of PromstroyElectro LLC has confirmed the high qualification of its personnel in the following areas: insulation resistance measurement, grounding resistance determination, and contact transition resistance measurement.

Certificate

PARTICIPANT IN LABORATORY PROFICIENCY TESTING

The testing laboratory of PromstroyElectro LLC has confirmed the high qualification of its personnel in the following areas: loop impedance "phase-neutral", tripping current and time of RCDs, and tripping current of circuit breakers.

Certificate

Certificate

The testing laboratory of PromstroyElectro LLC has confirmed the high qualification of its personnel in the field of high-voltage testing with leakage current measurement.

Completed projects

Minsk Republican Electric Power Enterprise «Minskenergo»

PromStroyElectro LLC performed works from August 2019 to May 2020 on the project “Power Supply of the Individual Housing Development Area on the Territory of the Former Military Camp in Maryina Gorka, Pukhovichi District (Phase I), Stage 1”.

«CITIC Construction Co., Ltd.»

LLC “SGS SopzëgasNop Co., 144” (PRC resident) contracted PromstroyElectro LLC to carry out construction and installation works on the external electricity supply network, in compliance with the technical specifications and project documentation, for the facility “High-tech full-cycle agro-industrial production in Uborki village, Dukorsky Village Council, Pukhovichi District, Minsk Region.”

During our collaboration, the company’s employees have proven themselves to be professionals committed to quality. All contractual obligations were fulfilled on time and in full. The Limited Liability Company “SITS Sopzgasvop Co., 144” regards PromstroyElectro LLC as a reliable partner.

cost

The cost of our services is always negotiable and is calculated based on the complexity of the equipment being commissioned, the scope of required measurements, and the distance of the site from Minsk. Our company provides a free engineer visit within Minsk for an initial inspection and preparation of the estimate.

You can determine the cost of typical types of work for free and without a site visit by calculating, for example, the number of cable lines, circuit breakers, RCDs, sockets, lighting fixtures and other electrical equipment. You can do this yourself or provide us with copies of the project documentation for the facility being commissioned, or copies of EFI protocols from previous years for an existing facility. Contact us or submit a request on our website, and our specialist will call you back shortly, provide consultation, and calculate the cost of work completely free of charge. We provide a warranty of 12 to 36 months on all our work. We also guarantee a refund and correction of any deficiencies at our expense in case of claims from representatives of the State Enterprise “GosenergoGazNadzor” branches or other supervisory (or controlling) authorities.