The following works were performed:
- Laying of 110 kV cable line;
- Laying of 10 kV cable line;
- Installation of closed crossings (trenchless pipe jacking);
- Laying of fiber-optic communication line (FOCL);
- Construction of cable duct system;
- Telemechanization;
- Construction of the closed switchyard building;
- Installation of switchyard power equipment (110 kV, 10 kV, 0.4 kV);
- Installation of Outdoor Switchgear (OSG) power equipment (110 kV, 10 kV, 0.4 kV);
- Cable structures of the switchyard building;
- Control mechanisms and electric lighting of the switchyard;
- Installation of fire, security, and surveillance systems (CCTV);
- Installation of cooling and ventilation systems;
- Lightning protection and grounding;
- Ventilation, heating, and air conditioning of the Closed Transformer Substation (CTP);
- Automation of heating and ventilation, water supply, and sewerage;
- Technological equipment;
- Installation of heating networks;
- External water supply and sewerage networks;
- Installation of the Commercial Electric Power Accounting System (ASUE) and Automated Commercial Accounting System (ASCA);
Installation of anti-icing system;
- Installation of oil drains (oil containment system);
- Organization of road traffic;
- Felling of trees and shrubs, compensatory plantings;
- Dismantling and restoration of asphalt/concrete road and pavement;
- Landscaping;
- External fencing;
- Vertical planning (earthworks/grading);
- Commissioning works.
Turnkey project delivery — from the start of construction to the commissioning of the facility.
Supply of materials and equipment at factory prices.
Certified specialists. Accredited testing laboratory.
Own construction and transport equipment.
Years on the construction market
Employees
Completed projects
km of cable lines laid